Українською
  In English
Feed aggregator
Blower Soldering Definition, Process, Working, Uses & Advantages
Blower soldering is a technique that utilizes a hot air blower or a hot air rework station to melt solder and create electrical connections between components. Unlike traditional soldering, which uses a heated metal tip to apply solder, blower soldering employs a controlled stream of heated air to achieve uniform soldering, making it ideal for surface-mount device (SMD) components and rework applications.
This method is widely used in electronics repair, PCB assembly, and component rework due to its precision and ability to work with delicate electronic parts.
How Blower Soldering WorksBlower soldering involves the following key steps:
- Preparation:
- Ensure the work area is clean and free of dust.
- Secure the printed circuit board (PCB) using a fixture or holder.
- Select the appropriate solder paste or pre-applied solder.
- Temperature & Airflow Settings:
- Adjust the hot air blower or rework station to the required temperature, typically between 250-450°C, depending on the solder type and components.
- Regulate the airflow to prevent displacement of small components.
- Heating Process:
- Direct the hot air over the target area in a circular or sweeping motion to evenly distribute the heat.
- Observe the solder as it melts and forms solid electrical connections.
- Cooling & Inspection:
- Allow the soldered area to cool naturally or use a cooling fan.
- Inspect the joints for uniformity and strength using a magnifying glass or microscope.
- Cleaning:
- Remove excess flux or residues using isopropyl alcohol and a brush.
- Component Installation:
- Position the SMD components onto the PCB with solder paste applied.
- Heating with Hot Air Blower:
- Apply heat evenly to reflow the solder paste and attach the components securely.
- Cooling Phase:
- Allow the solder joints to solidify properly before handling the PCB.
- Quality Check & Testing:
- Inspect for soldering defects such as bridges, cold joints, or insufficient solder.
Blower soldering is widely used in various electronics-related fields, including:
- Surface-Mount Technology (SMT) Assembly
- Ideal for soldering micro-sized SMD components that cannot be soldered using traditional methods.
- PCB Repair & Rework
- Used to remove and replace defective components on circuit boards.
- BGA & QFN Package Soldering
- Enables effective reflow soldering of Ball Grid Array (BGA) and Quad Flat No-Lead (QFN) components.
- Desoldering Applications
- Allows for easy removal of soldered components by melting the existing solder.
- Prototyping & Low-Volume Manufacturing
- Useful for rapid prototyping of circuit designs before mass production.
Blower soldering offers several benefits:
- Precision Heating:
- Ensures uniform temperature distribution, reducing thermal stress on components.
- Non-Contact Soldering:
- Unlike soldering irons, it prevents direct physical contact, minimizing damage to delicate parts.
- Ideal for Complex Components:
- Suitable for soldering fine-pitch components, including BGA and QFN packages.
- Rework & Repair Flexibility:
- Allows easy removal and replacement of individual components without damaging the PCB.
- Even Heat Distribution:
- Reduces the chances of cold joints or uneven solder application.
- Compatible with Lead-Free Soldering:
- Supports modern RoHS-compliant lead-free soldering processes.
Despite its advantages, blower soldering has some limitations:
- Risk of Overheating:
- Excessive heat can damage sensitive electronic components.
- Component Displacement:
- High airflow settings may blow away lightweight SMD components.
- Learning Curve:
- Requires skill and practice to control airflow and temperature accurately.
- Limited for Through-Hole Soldering:
- Not ideal for soldering through-hole components, which require traditional soldering techniques.
- Equipment Cost:
- High-quality hot air rework stations can be expensive compared to basic soldering irons.
Blower soldering is a highly effective method for assembling and repairing modern electronic circuits, particularly for SMD components and rework applications. With proper technique and equipment, it ensures reliable and high-quality soldering results. However, it requires careful control of temperature and airflow to prevent damage to sensitive components.
As electronics continue to shrink in size and complexity, blower soldering remains an essential technique in PCB manufacturing, prototyping, and repair industries. Whether you are an electronics hobbyist or a professional technician, mastering blower soldering can significantly improve your ability to work with advanced circuit designs.
The post Blower Soldering Definition, Process, Working, Uses & Advantages appeared first on ELE Times.
Rohde & Schwarz advances AI/ML-powered neural receiver testing in collaboration with NVIDIA
Rohde & Schwarz, in collaboration with NVIDIA, has achieved a significant breakthrough in AI-driven wireless communication research. The latest proof-of-concept to be showcased at MWC 2025 in Barcelona leverages digital twin technology and high-fidelity ray tracing for more realistic testing of neural receivers for 5G-Advanced and 6G.
Rohde & Schwarz continues to push the boundaries of AI-driven wireless communication research with its latest milestone in neural receiver design and testing. To be showcased at MWC 2025 in Barcelona, the latest proof-of-concept, developed in collaboration with NVIDIA, integrates digital twin technology and high-fidelity ray tracing to create a robust framework for testing 5G-Advanced and 6G neural receivers under realistic propagation conditions. The objective is to bridge the gap between AI-driven wireless simulations and real-world deployment, thereby facilitating more efficient and accurate testing of next-generation receiver architectures.
This marks the fourth significant milestone in a long-term collaboration of Rohde & Schwarz with NVIDIA with demonstration showcased at past Mobile World Congress events. The joint demonstrations have pioneered advancements in AI/ML for wireless communications over the past years, from the training of neural receivers for handling analog impairments to the design of custom constellations for pilotless communications.
At the core of the demonstration is NVIDIA Sionna, a GPU-accelerated open-source library for link-level simulations, which provides ray-traced wireless channel models to generate realistic RF propagation conditions. The simulation results can then be seamlessly transferred to the R&S SMW200A vector signal generator from Rohde & Schwarz, which emulates complex real-world radio channels without requiring expensive external RF fading equipment. This advanced testbed enables testing and verification of AI/ML-based receiver algorithms and supports data-driven fine-tuning of neural components using realistic training data.
To ensure that the digital twin and ray-tracing models accurately reflect real-world conditions, the simulation is calibrated with data from a dedicated channel-sounding measurement campaign set in an urban street-canyon environment. By combining these precise measurements with NVIDIA Sionna, the ray tracer’s ability to model material interactions and electromagnetic propagation is further refined. The result is a calibrated version of the digital twin of the physical RF environment. This combination of technologies enables more accurate site-specific testing and validation of next-generation machine learning-based communication algorithms, including applications such as neural receivers and ML-based CSI feedback enhancements.
Gerald Tietscher, Vice President Signal Generators, Power Supplies and Meters at Rohde & Schwarz, said: “The collaboration with NVIDIA marks a significant milestone in advancing AI/ML applications in wireless communications. Our work has already demonstrated the potential of AI in wireless system design, from custom constellations to neural receivers handling real-world impairments. Now, with the integration of digital twins and ray tracing, we are further expanding the possibilities of AI-driven signal processing.”
Soma Velayutham, Vice President of Telecommunications at NVIDIA, said: “Digital twin technology has transformative potential in wireless system design. By integrating advanced NVIDIA ray tracing and machine learning into receiver development, Rohde & Schwarz is paving the way for AI-native 6G networks poised to offer outstanding efficiency and innovation compared with conventional implementations.”
Rohde & Schwarz is a key contributor to global 6G research, collaborating with industry partners, research institutions, and standardization bodies to develop the next generation of wireless technologies, expected to be commercially deployed by 2030.
Visitors to MWC 2025 can experience this milestone demonstration live and speak with experts from Rohde & Schwarz and NVIDIA at the Rohde & Schwarz booth 5A80 in hall 5 of the Fira Gran Via in Barcelona from March 3 to 6, 2025. For further information on AI/ML for 6G networks, visit: https://www.rohde-schwarz.com/_257029.html
The post Rohde & Schwarz advances AI/ML-powered neural receiver testing in collaboration with NVIDIA appeared first on ELE Times.
Проректор Андрій Шишолін про результати міжнародної діяльності університету в 2024 році
На засіданні Вченої ради КПІ ім. Ігоря Сікорського 10 лютого з доповіддю "Міжнародна співпраця для сталого розвитку університету – результати 2024 року" виступив проректор з науково-педагогічної роботи (з міжнародних зв'язків) Андрій Шишолін. Представляємо читачам її повну версію.
Major Solar Power Plants in Madhya Pradesh Driving Renewable Energy Growth
Madhya Pradesh, a central Indian state, has emerged as a significant hub for solar energy, contributing substantially to India’s renewable energy goals. The state’s vast land resources and high solar irradiance make it an ideal location for large-scale solar power projects. This article provides an overview of the major solar power plants in Madhya Pradesh, highlighting their capacities, unique features, and contributions to the state’s energy landscape.
- Rewa Ultra Mega Solar Power Project
Commissioned in 2018, the Rewa Ultra Mega Solar Power Project is a landmark in India’s renewable energy sector. Located in the Gurh tehsil of Rewa district, this 750 MW solar park spans approximately 1,590 acres. It was among the first projects in India to achieve grid parity, with a first-year tariff of INR 2.97 per unit, significantly lower than previous records. The project is operated by Rewa Ultra Mega Solar Limited (RUMSL), a joint venture between Madhya Pradesh Urja Vikas Nigam Limited and the Solar Energy Corporation of India. Notably, about 24% of the energy produced is supplied to the Delhi Metro Rail Corporation, meeting 60% of its daytime energy requirements.
- Welspun Solar MP Project
Situated in Bhagwanpura village of Neemuch district, the Welspun Solar MP Project is a 151 MW photovoltaic power station. This project underscores the state’s commitment to harnessing solar energy and contributes significantly to the local grid, supporting both residential and industrial consumers.
- Agar Solar Park
The Agar Solar Park, currently under development, is poised to add 550 MW to Madhya Pradesh’s solar capacity. Developed by RUMSL, this project is part of a broader initiative to establish multiple solar parks across the state, aiming for a combined capacity of 1.5 GW. The Agar Solar Park is expected to play a crucial role in meeting the region’s energy demands sustainably.
- Shajapur Solar Park
Also under development by RUMSL, the Shajapur Solar Park will contribute an additional 450 MW to the state’s renewable energy portfolio. This project, along with the Agar and Neemuch Solar Parks, reflects Madhya Pradesh’s strategic efforts to expand its solar infrastructure and reduce reliance on fossil fuels.
- Neemuch Solar Park
The Neemuch Solar Park is set to enhance the state’s solar capacity by 500 MW. Developed by RUMSL, this project is part of the trio of solar parks, including Agar and Shajapur, collectively aiming to add 1.5 GW of renewable energy to Madhya Pradesh’s grid. These initiatives are instrumental in positioning the state as a leader in India’s solar energy sector.
- Omkareshwar Floating Solar Power Park
A pioneering project, the Omkareshwar Floating Solar Power Park is being constructed on the reservoir of the Omkareshwar Dam in Khandwa district. With a planned capacity of 600 MW, this floating solar installation is among the largest globally. The project is being developed in phases, with the initial phase commissioned in August 2024, adding 90 MW to the grid. This innovative approach not only utilizes existing water bodies but also minimizes land usage, showcasing a sustainable model for future projects.
- ACME Solar Energy-Madhya Pradesh Solar PV Park
Commissioned in March 2014, the ACME Solar Energy-Madhya Pradesh Solar PV Park is a 30 MW photovoltaic power project. Located in Madhya Pradesh, this plant contributes to the state’s renewable energy supply, supporting both local communities and industries.
Upcoming Investments by NTPCIn a significant development, India’s state power company NTPC has announced plans to invest over $23 billion in renewable energy projects in Madhya Pradesh. This investment will encompass various projects, including solar, wind, and pumped hydro, aiming to add up to 20 GW of capacity. This initiative underscores the state’s potential and attractiveness for large-scale renewable energy investments.
ConclusionMadhya Pradesh’s strategic investments and developments in solar energy have positioned it as a frontrunner in India’s renewable energy landscape. The state’s combination of large-scale solar parks, innovative floating solar projects, and substantial upcoming investments reflects a robust commitment to sustainable energy solutions. These initiatives not only contribute to meeting regional energy demands but also play a vital role in India’s overarching goal of transitioning to a greener and more sustainable energy future.
The post Major Solar Power Plants in Madhya Pradesh Driving Renewable Energy Growth appeared first on ELE Times.
Pages
